Power tool parts

Sintered Power Tool Parts Manufacturer & Supplier | IATF 16949 Factory in China Sintered Power Tool Parts Manufacturer & Supplier | IATF 16949 Factory in China
Sintered Power Tool Parts · IATF 16949 Factory

Sintered power tool parts built for gearboxes that never stop.

JH PM is a powder-metal factory in Ningbo, China. We press, sinter, and finish-machine gears, pinions, planetary sets, and clutch components for cordless drills, impact drivers, angle grinders, hammer drills, and rotary hammers. IATF 16949 since 2018, 19 PM presses (60–800 t), 10 sintering furnaces, and a closed-loop material-traceability system.

Sintered power tool parts are powder-metallurgy (PM) components pressed from iron, steel, or copper-infiltrated steel powders and sintered below the melting point. They replace machined or cast gears in power tools because they hit net or near-net shape, hold tight density, and run quietly in mesh. MPIF 35-aligned material grades, dimensional accuracy confirmed by Zeiss CMM, batch-traced from powder lot to shipment.
19PM presses
10Sintering furnaces
±0.025 mmCritical dims after sizing
48 hDFM quote
sintered power tool parts
Product families

Four part families covering the most common power-tool gear trains.

Each family is built on a different press-and-sinter flow, so the density, hardness, and post-machining window are tuned to the part’s load case. We don’t sell catalog gears; we engineer the powder blend, compaction curve, and finish-machining plan around your drawing.

sintered power tool parts

01 · Power & Rotary Tool Gears

Spur and helical gears, pinion shafts, and input/output gears with integrated keyways. Typical 0.4–2.0 kW power tools (impact drivers, hammer drills, rotary hammers). Density 6.8–7.2 g/cm³, surface hardened or through-hardened to fit your duty cycle.

  • 01 sintered power tool parts
  • 02 PM power tool components
  • 03 sintered gear power tool
sintered power tool parts

02 · Planetary & Reduction Gears

Planetary gear sets, ring gears, sun and planet pinions, and one-piece carrier/output-shaft assemblies. Built for the 2-stage and 3-stage reductions common in cordless drill and impact-driver gearboxes. Tight concentricity after sizing keeps the planet pinions running true under impact load.

  • 04 sintered planetary gear power tool
sintered power tool parts

03 · Drill & Driver Pinions

Small helical and spur pinions in matched batches, the parts that take the brunt of impact energy in cordless drills. We press with floating-die tooling to keep tooth profile symmetric, then case-harden where the customer needs it. Dimensional spread within a lot stays inside 0.02 mm on tooth thickness.

  • 05 sintered drill gear
sintered power tool parts

04 · Cutter, Hammer & Grinder Components

Bevel and pinion gears for angle grinders, hammer-clutch dogs, and cutter bodies. These parts run at higher peripheral speed and see shock loading, so we lean on Cu-infiltrated steel and post-sinter HIP where the duty cycle calls for it.

  • 06 sintered angle grinder gear
Process

From your 2D drawing to a packed carton in roughly 35 days.

Every step runs inside one factory, so the powder lot, the press, the furnace, and the CMM report all sit on the same batch record.

  1. DFM & Tooling

    48 h DFM feedback. Hard tooling T1 around day 20, sample around day 25.

  2. Compaction

    19 mechanical and hydraulic presses, 60–800 t. Floating-die where tooth profile symmetry matters.

  3. Sintering

    10 continuous-belt and batch furnaces, 1120–1280 °C, endothermic atmosphere.

  4. Sizing & Machining

    Re-press for tooth geometry, then CNC finish on bores, keyways, bearing journals.

  5. QA & Packout

    Zeiss CMM, gear tester, density check, MPIF 35 material cert, batch-traced carton.

Spec sheet

What we hold, what we don’t.

Numbers below are production-typical. We’ll confirm feasibility against your drawing before tooling kicks off.

Material familiesFe (MPIF F-0000), Ni-steels, Cu-infiltrated steels, 304L/316L stainless variants on request
Density6.6–7.2 g/cm³ typical (about 85–92% theoretical, MPIF-aligned). Higher on Cu-infiltrated parts.
Tensile / hardness340–650 MPa UTS as-sintered; up to 45 HRC after heat treat (case or through)
Dimensional accuracy±0.025 mm on selected critical dimensions after sizing and CNC. Press-direction tolerance wider on green height.
Surface finishAs-sintered Ra 2–4 micrometers; after sizing/CNC, Ra 0.8 micrometers on tooth flanks and bearing journals; OD-ground to Ra 0.4 micrometers
Gear qualityAGMA Q9–Q10 on application; tested on a Klingelnberg-style gear checker for profile and lead
Size envelopeSmallest sintered OD about 8 mm; largest OD roughly 120 mm, limited by press tonnage
Annual capacity3000+ tons of finished PM parts, including 600+ tons of MIM-grade feedstock capacity
CertificationsIATF 16949:2016, ISO 9001:2015, RoHS, REACH, PPAP, IMDS, MPIF 35 material reports
MOQ / tooling2,000 pcs typical; 10,000+ pcs/year is where PM tooling amortizes cleanly
Why JH PM

Single factory, audited supply chain, honest numbers.

One site, one batch record

Pressing, sintering, sizing, CNC, and final QA all sit on the same factory floor in Ningbo. The MES ties powder lot, press, furnace, and inspection data to every carton, so PPAP submissions and field issues trace back in minutes, not days.

Material data, not marketing

We publish MPIF 35-aligned tensile, hardness, and density curves per grade, not vague “high strength” claims. If a part sits outside the envelope below, we tell you at DFM and propose a MIM or machined-bar fallback.

48-hour DFM, real engineers

Every RFQ gets a written DFM note from a process engineer, not a templated auto-reply. We mark up your drawing with concerns, suggest a tooling split if the geometry is press-unfriendly, and price FAI, PPAP, and ongoing production separately.

Shop floor

Parts we’re running this quarter.

FAQ

Questions power-tool buyers ask before the first PO.

What surface roughness and post-machining can you hold on sintered power tool gears?
As-sintered Ra is typically 2-4 micrometers. After sizing and CNC finish-machining, we routinely hold Ra 0.8 micrometers on tooth flanks and bearing journals; OD-grinding can reach Ra 0.4 micrometers on cylindrical surfaces. Tell us your required Ra in the drawing notes.
What is the smallest and largest sintered power tool part you can press?
Smallest sintered OD we press for power tools is around 8 mm; largest OD is roughly 120 mm, limited by press tonnage (we run 60-800 t) and part height. Outside that envelope, the part is better suited to MIM or machined bar stock.
Do you support PPAP for power tool programs?
Yes. As an IATF 16949-certified plant we support PPAP at the level your customer requires, including FAI reports, material certificates per MPIF 35, IMDS submissions, and initial-process studies (Cp/Cpk) on critical CTQs.
Can you match a competitor’s part I am already running?
Send the drawing, the existing supplier’s material cert, and a worn sample if you have one. We reverse-engineer the powder grade, density, and hardness, then run a small validation batch against your current acceptance criteria before quoting production.
What is the lead time from PO to first production batch?
For new tooling, hard tooling T1 is roughly 20 days, sample around day 25, and PPAP/FAI in week 5-6. For repeat orders on existing tooling, typical lot cycle is 25-30 days depending on sizing and CNC content.
How do you handle export packaging and documentation for EU/US buyers?
Carton-packing with paper separators and silica gel; export-grade pallet on request. We prepare commercial invoice, packing list, COO, MPIF 35 material cert, and any EU/US regulatory paperwork (RoHS, REACH, PPAP, IMDS) you need.
Get a quote

Send your drawing, get a 48-hour DFM.

Tell us the part, the annual volume, and the duty cycle. We’ll come back with a feasibility note, a tooling estimate, and a sample plan within two working days.

Or email info@chinapmfactory.com with your STEP / PDF drawing.

4 families · 10 part types

What we make for power tool drivetrains

Grouped by function inside the tool — from main drive gears to clutch and grinder sub-assemblies. Each part is pressed, sintered, sized and finish-machined in our own plant.

Family 01 · Power & Rotary

Spur & helical gears for power tool drivetrains

Main drive and output gears with keyways, hub bosses and lightening holes. Spur and mixed-pitch helical profiles in one lot, ready for shaft press-fit or heat-treated mating.

  • 01sintered power tool parts
  • 02PM power tool components
  • 03sintered gear power tool
Sintered spur and helical gears with keyways and lightening holes for power tools
Family 02 · Planetary & Reduction

Planetary gear sets and reduction gear stages

Sun, planet and ring-carrier sub-assemblies for planetary reduction gearboxes. Multi-stage combinations for impact drivers, hammer drills and high-torque rotary tools.

  • 04sintered planetary gear power tool
Sintered planetary gear set with sun, planets, ring gear and output shaft
Family 03 · Drill & Driver Pinions

Drill pinions and small-module helical gears

Small-module pinions and pinion-idler sets for cordless drills, drivers and rotary hammers. Tight tooth-to-tooth pitch control from lot to lot, so your gear train runs quiet.

  • 05sintered drill gear
Lot of identical small-module sintered helical pinion gears for cordless drills
Family 04 · Cutter, Hammer & Grinder

Angle grinder pinions, hammer clutches and cutter gears

Bevel-helix pinions for angle grinders, hammer clutch plates and sub-assemblies, multi-tooth cutters. Mixed-form gears in the same lot, finish-ground where your drawing requires.

  • 06sintered angle grinder gear
Sintered angle grinder pinion and hammer clutch sub-assemblies
From drawing to part · 5 steps

How a sintered power tool part leaves our plant

Closed-loop process from your 3D/2D drawing to the shipping carton. DFM feedback at step one, batch-level traceability at step five.

DFM review

48-hour feedback on print feasibility, density, draft, machining stock.

Tooling & sampling

Multi-cavity die, ~20-day lead, first samples within 25 days of PO.

Compacting

19 mechanical and hydraulic presses, 60–800 t, multi-level parts.

Sintering & sizing

10 continuous furnaces; sizing restores critical-dimension geometry.

CNC & inspection

Drilling, broaching, OD/ID grinding; CMM and gear checker reports.

Reading this on a phone? Send your STEP/IGES to info@chinapmfactory.com and we will reply within 48 hours.

Spec sheet

Sintered power tool part specifications

Defaults below — we adjust every value to your drawing. Anything outside this range goes to our MIM line or our machine shop.

ParameterTypical range · PM process
MaterialsFe, Cu-Fe, Fe-Ni, Fe-Cu-Ni-Mo, 316L / 17-4PH stainless on request
Density6.6–7.2 g/cm³ (about 85–92% of theoretical density)
Tensile strength~300–700 MPa, material dependent
HardnessAs-sintered 40–80 HRB; through-hardened or case-hardened on request
Critical-dimension tolerance±0.025 mm on selected critical dimensions after sizing & CNC
Outer diameterup to ~120 mm depending on press tonnage and part height
Module rangemodule 0.5–1.5 typical; coarser modules on review
Min. order quantity2,000 pcs / part number; tooling amortizes economically from 10,000+ pcs/yr
Lead timetooling ~20 days, samples ~25 days after PO, production 30–45 days
Quality systemIATF 16949:2016, ISO 9001:2015, PPAP supported

Density is reported in g/cm³ (line 1) and as a percentage of the material’s theoretical density (line 2) — both are common in PM datasheets; convert as 1 g/cm³ = 1000 kg/m³.

Why JH PM

Three reasons buyers keep re-issuing POs

Not a marketing claim — each point is something our customers can audit on a sample shipment or a supplier audit visit.

01 · In-house

Press to sinter under one roof

Compacting, sintering, sizing and finish-machining are all on the same campus in Ningbo. No subcontracted steps between die and dispatch — one quality system, one batch lot, one MES record.

02 · Stable batches

Pitch and density you can re-run

Lot-level records of sintered density, hardness and gear pitch. Re-orders open the same MES batch, so a 2027 PO can match a 2025 sample to within your drawing tolerance.

03 · Honest DFM

DFM in 48 hours, even when the answer is no

If a part shouldn’t be PM, we say so and route it to our MIM or machining lines. If it should be PM but your print is over-specified, we tell you which tolerance to relax and why.

FAQ

Questions we get from power tool buyers

What surface roughness and post-machining can you hold on sintered power tool gears?
As-sintered Ra is typically 2-4 micrometers. After sizing and CNC finish-machining, we routinely hold Ra 0.8 micrometers on tooth flanks and bearing journals; OD-grinding can reach Ra 0.4 micrometers on cylindrical surfaces. Tell us your required Ra in the drawing notes.
Can you make stainless (316L / 17-4PH) power tool parts on the PM line?
Yes, on request. Stainless PM has higher tooling wear and tighter process windows than Fe/Cu-Fe, so lead time and tooling cost are higher. For very small, complex stainless parts we usually route to our MIM line instead — we will tell you which is more economical on the DFM review.
What is the smallest and largest sintered power tool part you can press?
Smallest sintered OD we press for power tools is around 8 mm; largest OD is roughly 120 mm, limited by press tonnage (we run 60-800 t) and part height. Outside that envelope, the part is better suited to MIM or machined bar stock.
Do you support PPAP and IMDS for power tool programs?
Yes. As an IATF 16949-certified plant we support PPAP at the level your customer requires — FAI reports, material certificates, IMDS / CAMDS entries, and initial process studies (Cpk ≥ 1.33 typical on critical features).
What is the typical MOQ and how does it relate to tooling amortization?
Standard MOQ is 2,000 pcs per part number. Tooling cost amortizes economically from around 10,000+ pcs per year, so if your annual volume is below 10,000 we may suggest a shared-die or machined-barstock approach. Tell us your annual forecast on the RFQ and we will quote both.
Can you ship RoHS, REACH and PPWR-compliant power tool parts to the EU?
Yes. We declare RoHS and REACH SVHC status on every MTC, and we support the EU Packaging and Packaging Waste Regulation (PPWR) documentation for retail-packaged shipments. Conflict-mineral (3TG) disclosure is available on request.
Send your drawing · we reply in 48 hours

Need a sintered power tool part quoted?

Send us your STEP / IGES / PDF, the annual forecast and the critical-dimension notes. We will reply with a DFM review, a piece price range, and tooling lead time within 48 hours.

DFM in 48h · tooling ~20 days · samples ~25 days · MOQ 2,000 pcs